Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-10 of 10
Keywords: Contract
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2024) 31 (13): 79–101.
Published: 09 November 2023
... estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase. Design/methodology/approach This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate...
Journal Articles
Identifying focus areas to decode the decision to litigate contractual disputes in construction
Available to Purchase
Engineering, Construction and Architectural Management (2022) 29 (8): 2976–2998.
Published: 29 June 2021
... understand the dynamics behind the DTL in the context of contract-linked disputes in construction. Originality/value The findings from the domains of law, behavior, sociology and economics can help understand the above dilemma in the context of contractual disputes in construction. However, studies...
Journal Articles
Collaboration in BIM-based construction networks: a qualitative model of influential factors
Available to Purchase
Engineering, Construction and Architectural Management (2022) 29 (3): 1194–1217.
Published: 07 April 2021
... clear and comprehensive BIM execution plans and clearly explaining the role of BIM managers in the process. Building information modelling Coordination Barrier Interview Contract The failure of industry practitioners in shifting common practices to foster collaboration among members...
Journal Articles
Contract complexity and trust in construction project subcontracting
Available to Purchase
Engineering, Construction and Architectural Management (2020) 27 (9): 2477–2500.
Published: 02 May 2020
...Shui Bo Zhang; Junying Chen; Yafan Fu Purpose The purpose of this paper is to unpack the “black box” of the relationship between contract and inter-organizational trust, both theoretically and empirically. Two mediators, namely perceived safeguard and restriction, are identified to build up two...
Journal Articles
The challenges of adopting new engineering contract: a Hong Kong study
Available to Purchase
Engineering, Construction and Architectural Management (2019) 26 (10): 2389–2409.
Published: 31 July 2019
...Chung Him Lau; Jayantha Wadu Mesthrige; Patrick T.I. Lam; Arshad Ali Javed Purpose Project delays and cost over-runs are few common major problems arising from conventional contracts. To overcome these issues, the Hong Kong Government has been practicing the use of the New Engineering Contract...
Journal Articles
A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts
Available to Purchase
Engineering, Construction and Architectural Management (2019) 26 (6): 1004–1023.
Published: 01 March 2019
...Amira Shalaby; Amr Hassanein Purpose Public private partnership contracts tend to have longer contract durations compared to other conventional procurement methods. A contract renegotiation becomes inevitable in most of the cases. The renegotiation process usually develops a number of scenarios...
Journal Articles
A method for identifying high outliers in construction contract auctions
Available to Purchase
Engineering, Construction and Architectural Management (2002) 9 (2): 90–130.
Published: 01 February 2002
...MARTIN SKITMORE; H.P. LO Construction contract auctions are characterized by (1) a heavy emphasis on the lowest bid as it is that which usually determines the winner of the auction, (2) anticipated high outliers because of the presence of non‐competitive bids, (3) very small samples, and (4...
Journal Articles
UK practice in dealing with claims for delay
Available to Purchase
Engineering, Construction and Architectural Management (2001) 8 (5-6): 317–324.
Published: 01 May 2001
... have fared ‘but for’ the existence of employer‐responsible delays. There is less agreement about who should be said to own the float, but as is explained in the paper, it is possible for this matter to be dealt with by the insertion of a clause in the contract documents. © MCB UP Limited 2001...
Journal Articles
Differing site conditions risks: a FIDIC/engineering and construction contract comparison
Available to Purchase
Engineering, Construction and Architectural Management (1999) 6 (2): 177–187.
Published: 01 February 1999
...ISSAKA NDEKUGRI; BARRY MCDONNELL A new edition of the FIDIC Red Book is under discussion. It is an issue whether this edition should be based on the current edition or there should be a complete break with tradition in favour of a contract based on a new philosophy such as that of the NEC, which...
Journal Articles
Commercial viability of privately financed heating systems in Europe — a case study
Available to Purchase
Engineering, Construction and Architectural Management (1998) 5 (1): 3–8.
Published: 01 January 1998
...COLIN DUFFIELD This paper presents a detailed case study of how a European heating contractor analysed the commercial viability of privately financing a critical component of the construction of new apartment heating systems in return for ongoing maintenance contracts. The adaptation of some...
