Open figure viewer
Describes the new library building of the University of Agriculture, Abeokuta, Nigeria, completed in 1992. Gives a brief history of the existing library as background. Highlights the planning processes involved, including critical choices made, location of the building,preparation of architects′ briefs, architect‐librarian relationship,choice of building contractors and features of the building. Discusses problems of supervision, security and maintenance likely to arise from the use of the building. Concludes that the library building meets the required functional and aesthetical standards required of libraries in the tropics and should be critically studied by other Nigerian universities planning to put up their own libraries.
© Company
1995
You do not currently have access to this content.
