Skip to Main Content
Article navigation

Section 2 of the Channel Tunnel Rail Link – now known as High Speed 1 – included the construction of a new station for the existing Thameslink rail service under St Pancras International station. This paper describes the construction of the Thameslink box on the route of the existing tunnel along with a direct passenger interchange with the new international station. Two new tunnels were also constructed forming a potential connection to the existing East Coast main-line route.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal