You do not currently have access to this content.
Article navigation
1 August 1987
Research Article|
August 01 1987
CREWE TRACK AND STATION REMODELLING SCHEME. DISCUSSION. Available to Purchase
Publisher: Emerald Publishing
© Thomas Telford and ICE
1987
Proceedings of the Institution of Civil Engineers (1987) 82 (4): 887.
Citation
BARWELL A, CUTTING W, COOKSEY A (1987), "CREWE TRACK AND STATION REMODELLING SCHEME. DISCUSSION.". Proceedings of the Institution of Civil Engineers, Vol. 82 No. 4 pp. 887, doi: https://doi.org/10.1680/iicep.1987.279
Download citation file:
Suggested Reading
DISCUSSION. ON THE ARRANGEMENT AND CONSTRUCTION OF RAILWAY STATIONS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1858)
CREWE TRACK AND STATION REMODELLING SCHEME.
Proceedings of the Institution of Civil Engineers (October,1986)
DISCUSSION. DESCRIPTION OF THE ST. PANCRAS STATION AND ROOF, MIDLAND RAILWAY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1870)
DISCUSSION. THE CITY TERMINUS EXTENSION OF THE CHARING CROSS RAILWAY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1868)
DESCRIPTION OF THE IRON SHED AT THE LONDON TERMINUS OF THE EASTERN COUNTIES RAILWAY.,
Minutes of the Proceedings of the Institution of Civil Engineers (January,1844)
Related Chapters
Development of two different station designs – a comparison of Paddington and Farringdon Stations
Crossrail Project: Infrastructure Design and Construction
Design of Paddington Station
Crossrail Project: Infrastructure Design and Construction
Farringdon station SCL Design – Reducing risk at the heart of Crossrail
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
