Table 7

Overview of the main activities in L/UL in Case 3

StageActivities
Before loading (sender)
  1. Pallets with finished goods are moved close to the outbound area with a conveyor

  2. The pallets are stacked and then moved to lanes in the outbound area by AGVs

Truck arrival
  1. The autonomous truck arrives to the factory and docks with the loading bay

  2. Sensors assist in achieving sufficient truck–loading bay alignment

  3. A dock lip is engaged by the L/UL control which verifies that the loading can be started

Loading activities (sender)
  1. L/UL control verifies that the loading can be started

  2. The L/UL control sends a request to the warehouse management system (WMS) which verifies the number of pallets to be loaded

  3. The WMS sends a request to the AGV system including a pattern for how the pallets should be loaded to secure the cargo

  4. An AGV is assigned to loading and the loading is started

  5. When the loading is completed, the remote operator receives a signal and verifies that the cargo is secure by cameras

Truck departure
  1. The dock lip is disengaged by the L/UL control which verifies that the truck can depart

  2. The autonomous truck departs for the warehouse

Transport
  1. Transport to the warehouse is performed

Truck arrival
  1. The Truck arrival activities are repeated

Unloading activities
  1. L/UL control verifies that the unloading can be started

  2. The L/UL control sends a request to the AGV system

  3. An AGV is assigned to unloading, and the unloading is started

  4. When the unloading is completed, the dock lip is disengaged by the L/UL control which verifies that the truck can depart

Post-unloading (recipient)
  1. Operators at the warehouse move the received pallets to storage locations

  2. The autonomous truck departs for the factory

Source(s): Table by authors