Overview of case studies characteristics
| Case A | Case B | Case C | Case D | Case E | |
|---|---|---|---|---|---|
| Building construction year | 1932 | 1897 | 1975 | 2001 | 1978 |
| Building construction material | concrete | brick | concrete | concrete | concrete |
| Total number of floors in the case study building | 5 | 5 | 7 | 2 | 6 |
| Case study floor level | 4th | 1st | Ground | Ground | 5th |
| Gross unit floor area (m2) | 31 m2 | 38,5 m2 | 65 m2 | 57 m2 | 56 m2 |
| Window orientation | South | West | East–West | South | West |
| Internal window shading | yes | yes | yes | yes | yes |
| Kitchen extraction hood | yes | yes | yes | yes | no |
| Local standing fan | yes | yes | no | yes | no |
| Number of indoor sensors used | 5 | 5 | 4 | 4 | 4 |
| Monitoring period | June 9–July 22 | June 9–July 11 | July 22–August 4 | August 5–20 | August 29–September 19 |
| Number of monitoring days | 43 | 32 | 13 | 15 | 21 |
| Case A | Case B | Case C | Case D | Case E | |
|---|---|---|---|---|---|
| Building construction year | 1932 | 1897 | 1975 | 2001 | 1978 |
| Building construction material | concrete | brick | concrete | concrete | concrete |
| Total number of floors in the case study building | 5 | 5 | 7 | 2 | 6 |
| Case study floor level | 4th | 1st | Ground | Ground | 5th |
| Gross unit floor area (m2) | 31 m2 | 38,5 m2 | 65 m2 | 57 m2 | 56 m2 |
| Window orientation | South | West | East–West | South | West |
| Internal window shading | yes | yes | yes | yes | yes |
| Kitchen extraction hood | yes | yes | yes | yes | no |
| Local standing fan | yes | yes | no | yes | no |
| Number of indoor sensors used | 5 | 5 | 4 | 4 | 4 |
| Monitoring period | June 9–July 22 | June 9–July 11 | July 22–August 4 | August 5–20 | August 29–September 19 |
| Number of monitoring days | 43 | 32 | 13 | 15 | 21 |
Note(s): Data obtained from occupant survey
Source(s): Authors’ own work
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.