Table 2.

Summary of all input variables after feature engineering

Var.Variable nameProject characteristicEconomic factorDescription
X1Project sizex The project size was classified with reference to tendering limits set by BCA for different grades of registered contractors who are eligible to participate in tenders for public sector CW01 and CW02 projects. All project values (winning contracts) were first updated to a common base using the BCA TPI December quarter 2022 to facilitate the project size classification into small (≤ S$ 5 mil), medium (>S$5 mil and up to S$ 50 mil), large (>S$5 mil and up to S$ 105 mil) and extra-large (> S$105 mil) projects
X2Work naturex The work nature of projects and there are two types, namely, new and alteration/upgrading
X3Construction workhead (CW)x The construction workhead of projects and there are two groups, namely, general building and civil engineering
X4Yearx The calendar year when the tender closed
X5-1TPI_close xQuarterly tender price index (TPI) when the tenders closed, which is compiled quarterly by the Singapore BCA [44]. It indicates the level of tender prices for all new building projects, but it excludes piling, substructure works, external works and mechanical and electrical services
X5-2TPI_trend xTPI trend when the tender closed, 1 = an increase in TPI from preceding quarter; −1 = a decrease in TPI from preceding quarter; and 0 = no change in TPI from preceding quarter
X5-3TPI_ROC xTPI rates of change from preceding quarter when the tenders closed, which were expressed in percentage terms
X6-1Construction demand_close xQuarterly construction demand based on total value of contracts awarded (in S$ million) by both public and private sectors for building and civil engineering works (excluding reclamation works) when the tender closed. This is compiled quarterly by the Singapore BCA [40]
X6-2Construction demand_trend xConstruction demand trend when the tenders closed, 1 = an increase in demand from preceding quarter; −1 = a decrease in demand from preceding quarter; and 0 = no change in demand from preceding quarter
X6-3Construction demand_ROC xConstruction demand rates of change from preceding quarter when the tender closed, which were expressed in percentage terms
Source(s): Authors’ own work