Table 4

Summary of material consumption and production time for conventional moulding inserts (subtractive manufacturing) and CCC inserts (additive manufacturing)

Material consumption and production timeUnitSubtractive manufacturingAdditive manufacturing
CoreCavityTotalCoreCavityTotal
Spent materialg4,2002,4006,6002,0021,1683,170
Material cost50151.50
Pre-production timehh:mm02:4004:2007:0000:1500:1500:30
Production timehh:mm07:4507:2515:1059:521
Finishing operations timehh:mm02:5500:5003:4505:4009:3515:15
Total timehh:mm13:2012:3525:5505:5509:5075:37
Total cost25802,150
Final massg1,8951,1423,0371,5909952,585
Material waste%355%52%54%21%15%18%
Note(s):

1Considering the simultaneous production of the two injection moulding inserts; 2Value considers pre-production, production and finishing operations; 3Based on the material used and the final weight of the moulding inserts

Source(s): Authors’ own work