Summary of most relevant studies
| References | Method | Constraints | Objectives | Parallel production | Pre-trained rescheduling policy |
|---|---|---|---|---|---|
| Liu et al. (2023) | GA | , | Yes | No | |
| Wang et al. (2021) | GA | Yes | No | ||
| Wang and Hu (2018) | GA | , , | Yes | No | |
| Du and Li (2024) | DRL-based EA | , | Yes | No | |
| Kim et al. (2020) | DQN | No | Yes | ||
| Proposed Method | DQN | , | , | Yes | Yes |
| References | Method | Constraints | Objectives | Parallel production | Pre-trained rescheduling policy |
|---|---|---|---|---|---|
| GA | Yes | No | |||
| GA | Yes | No | |||
| GA | Yes | No | |||
| DRL-based EA | Yes | No | |||
| DQN | No | Yes | |||
Note(s): : machine environment constraints; : working hour limits; : number of molds; : total weighted energy price; : number of labors
: makespan; : earliness penalty; : tardiness penalty; : rescheduling cost; : total idle time; : mold changeover fees; : delivery penalty; : energy cost