Calibration methods and the error limits allowed in each method
| Metric | Standardized by | Error limits | References |
|---|---|---|---|
| RMSE | ASHRAE Guideline 14 | 10–20% | Ali et al. (2021), Al-Shargabi et al. (2022), ASHRAE (2002), Chong et al. (2021), Dahlström et al. (2022), Franceschini and Neves (2022) |
| CV(RMSE) | ASHRAE Guideline, IPMVP, FEMP | 15–30% (monthly and hourly results) | ASHRAE (2002), IPMVP (2022), Hou et al. (2021), Li et al. (2017) |
| MBE | ASHRAE Guideline, IPMVP, FEMP | 5–20% (monthly and hourly results) | ASHRAE (2002), Franceschini and Neves (2022), Hou et al. (2021) |
| NMBE | ASHRAE Guideline, IPMVP, FEMP | 5–20% (monthly and hourly results) | Ali et al. (2021), ASHRAE (2002), Chong et al. (2021) |
| GOF | ASHRAE Guideline | 0.5–1% | ASHRAE (2002), Chong et al. (2021), Cipriano et al. (2015) |
| R2 | – | Close to 0.999 (monthly and hourly measurements) | ASHRAE (2002), Chong et al. (2021), Singaravel et al. (2018) |
| Metric | Standardized by | Error limits | References |
|---|---|---|---|
| RMSE | ASHRAE Guideline 14 | 10–20% | |
| CV(RMSE) | ASHRAE Guideline, IPMVP, FEMP | 15–30% (monthly and hourly results) | |
| MBE | ASHRAE Guideline, IPMVP, FEMP | 5–20% (monthly and hourly results) | |
| NMBE | ASHRAE Guideline, IPMVP, FEMP | 5–20% (monthly and hourly results) | |
| GOF | ASHRAE Guideline | 0.5–1% | |
| R2 | – | Close to 0.999 (monthly and hourly measurements) |
Source(s): Created by the authors, 2023
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.