Table 5.

Restoration tasks for the temporary Pooley Bridge compared with data from Table 1 

CodeDuration: days
Values from Table 1 Temporary Pooley Bridge
MinMaxMeanMinMaxMean
R15.624.815.25.624.815.2
R33106.562013
R12624.314.7624.314.7
R132.97.45.22.97.45.2
R20123222123222
R2388.8334211.488.8334211.4
Total121.3442.5281.5

or Create an Account

Close Modal
Close Modal