TableĀ 5

Technical-organizational interdependencies during AI development

Technical requirementOrganizational adaptationCoordination mechanismEvidence source
Consistent torque control for reliable model trainingPLC parameter adjustment across 5 controllersMaintenance-Data Science workshopsWorkshop notes, PLC logs, 4-month iterative process
Interpretable anomaly outputsInterface design with SPC chart formatsUser co-design sessions20 interviews, interface iterations
Model validation without labelled defectsPhysics-based synthetic defect creationDomain expert collaborationWorkshop 2, Master axle testing
Threshold selectionYield estimation and rework capacity analysisCross-functional consensus buildingWorkshop 3, production data

or Create an Account

Close subscription notice
Close access options