Overview of case study construction sites
| Project details | Site A | Site B |
|---|---|---|
| Project size | Large (62 600 m2) | Medium (22 845 m2) |
| Structures | Six blocks high-rise (up to 79 m) | Two blocks low-rise (up to 21.5 m) |
| Monitoring duration | 3 years | 6 months |
| Data resolution | 15 min | 1 h |
| Data breakdown | Gross site usage only recorded | Data recorded for 6 submeters showing demand from various activities including tower cranes, drying rooms, and outdoor lighting |
| Anomalies | N/A | Monitoring campaign interrupted by COVID-19 lockdown |
| Project details | Site A | Site B |
|---|---|---|
| Project size | Large (62 600 m2) | Medium (22 845 m2) |
| Structures | Six blocks high-rise (up to 79 m) | Two blocks low-rise (up to 21.5 m) |
| Monitoring duration | 3 years | 6 months |
| Data resolution | 15 min | 1 h |
| Data breakdown | Gross site usage only recorded | Data recorded for 6 submeters showing demand from various activities including tower cranes, drying rooms, and outdoor lighting |
| Anomalies | N/A | Monitoring campaign interrupted by COVID-19 lockdown |