Table 1.

Overview of case study construction sites

Project detailsSite ASite B
Project sizeLarge (62 600 m2)Medium (22 845 m2)
StructuresSix blocks high-rise (up to 79 m)Two blocks low-rise (up to 21.5 m)
Monitoring duration3 years6 months
Data resolution15 min1 h
Data breakdownGross site usage only recordedData recorded for 6 submeters showing demand from various activities including tower cranes, drying rooms, and outdoor lighting
AnomaliesN/AMonitoring campaign interrupted by COVID-19 lockdown