Table 4.

Comprehensive evaluation of railway transport resilience of a railway line

Primary indicatorSecondary indicatorTertiary indicatorComprehensive weightAverage expert scoreScore contribution
Exposure degree-A1Route Mileage-P10.0032217.7142860.024849
Bridge Count-P20.0071537.6190480.054496
Tunnel Count-P30.0063747.4761900.047655
Station Count-P40.0141058.3333330.117546
Depot/Section Count-P50.0123638.0476190.099493
Resistance capability-A2Flood control capacity-P6Design flood frequency-W10.0147737.3333330.108337
Bridge/culvert clearance and foundation depth-W20.0147738.1904760.120999
Embankment slope stability-W30.0147737.7142860.113964
Seismic Resistance Capacity-P7Seismic design intensity-W40.0076468.2380950.062987
Structural seismic performance-W50.0076467.9047620.060438
Earthquake early warning System-W60.0076466.8095240.052064
Wind Resistance Capacity-P8Design wind speed-W70.0039477.9047620.031203
Wind protection facilities-W80.0039477.6666670.030263
Train wind resistance stability-W90.0039477.9047620.031203
Snow Resistance Capacity-P9Maximum snow depth-W100.0019917.8095240.015552
Snow removal equipment-W110.0019917.9047620.015741
Rail heating system-W120.0019917.3333330.014603
Lightning Protection Capacity-P10Lightning protection grounding-W130.0010238.0952380.008282
Lightning rods-W140.0010237.3809520.007551
Lightning monitoring and warning system-W150.0010238.6190480.008818
Response Capacity-A3Emergency Organizations and Institutions-P11Emergency management framework-W160.0137197.8095240.107136
Emergency decision mechanism-W170.0137198.0476190.110402
Emergency command mode-W180.0137197.8095240.107136
Emergency responsibilities-W190.0137197.4285710.101910
Emergency rescue network-W200.0137197.7619050.106483
Emergency Regulations and Plans-P12Emergency regulations and standards-W210.0076077.4761900.056875
Emergency assessment methods-W220.0076077.8571430.059773
Emergency response procedures-W230.0076077.7142860.058686
Emergency plans-W240.0076077.6666670.058324
Post-specific emergency methods-W250.0076078.5238100.064844
Emergency Equipment and Materials-P13Emergency supplies-W260.0071087.8571430.055845
Emergency equipment-W270.0071087.7142860.054830
Emergency equipment management-W280.0071088.1428570.057876
Construction of Emergency Information System-P14Emergency platform development-W290.0030337.8095240.023690
Emergency command system-W300.0030337.7142860.023401
Emergency supply management system-W310.0030337.7142860.023401
Emergency communication-W320.0030338.6190480.026146
Emergency Training and Drills-P15Emergency training organization-W330.0027727.7142860.021383
Emergency training bases-W340.0027727.9047620.021911
Emergency drill organization-W350.0027727.7142860.021383
Drill evaluation-W360.0027728.0476190.022307
Emergency Disposal-P16Incident reporting-W370.0012628.0952380.010212
Emergency monitoring-W380.0012628.5714290.010813
Information release-W390.0012628.2857140.010453
Emergency evacuation-W400.0012627.7619050.009792
Plan activation-W410.0012628.1904760.010332
Emergency coordination-W420.0012628.5238100.010753
Management responsibilities-W430.0012627.5238100.009491
Response implementation-W440.0012628.0952380.010212
Equipment adequacy-W450.0012627.6666670.009672
Plan execution-W460.0012627.7619050.009792
Plan effectiveness-W470.0012627.8095240.009852
Risk mitigation measures-W480.0012627.7619050.009792
After-action analysis-W490.0012628.1428570.010272
Corrective actions-W500.0012627.7142860.009732
Personnel Quality-P17Decision-makers-W510.0027728.2857140.022967
Command personnel-W520.0027728.1904760.022703
Technical rescue teams (rolling stock, track, signals, power)-W530.0027728.0476190.022307
Expert rescue teams-W540.0027728.1428570.022571
Adaptability-A4Operational adjustment timeliness-P180.0377358.2380950.310869
Resource optimization rationality-P190.0684898.1428570.557697
Technical improvement level-P200.1241788.6190481.070296
Restoration Capability-A5Restoration duration-P210.0750638.4761900.636251
Recovery speed-P220.1362388.6190481.174243
Recovery quality-P230.2470148.6190482.129029
Source(s): Authors’ own work, derived from the comprehensive weighting and scoring analysis based on the expert evaluation data (Figure 2), the AHP judgment and consistency test results (Tables 2–3), and the indicator system defined in Table 1 

or Create an Account

Close subscription notice
Close access options