Translating RL and CLSC risks into stakeholder actions and KPIs
| P-I-M risk group | Risk type | Stakeholder(s) | Recommended action | Key KPI(s) |
|---|---|---|---|---|
| A (Low P–High I–Low M) |
| OEMs/Re-manufacturers |
|
|
| Suppliers/Collectors/3PLs |
|
| ||
| Regulators/public agencies |
|
| ||
| B (Medium P–Medium I–Medium M) |
| OEMs |
|
|
| Recyclers/Remanufacturers |
|
| ||
| Suppliers/Logistics Partners |
|
| ||
| C (High P–Low I–High M) |
| OEMs/Process Engineers |
|
|
| Disassembly and Inspection Centres |
|
| ||
| D (Medium P–High I–Medium M) |
| OEMs, Public Sector |
|
|
| Recyclers |
|
| ||
| E (Medium P–Medium I–Low M) |
| Manufacturers/Retailers |
|
|
| Marketing/Customer Interface |
|
| ||
| F (Medium P–High I–Low M) |
| OEMs/Governments |
|
|
| Recyclers |
|
| ||
| G (P-I-M not applied) |
| All stakeholders |
|
|
| P-I-M risk group | Risk type | Stakeholder(s) | Recommended action | Key KPI(s) |
|---|---|---|---|---|
Facility disruption Supply disruption Demand disruption Collection disruption Cost disruption Production disruption | OEMs/Re-manufacturers | Develop multi-route and multi-facility recovery pathways and alternative processing capacity for hybrid facilities (production–recovery) Have backup processors pre-contracted | Time-to-recovery % recovery throughput restored within 48 h Network redundancy index | |
| Suppliers/Collectors/3PLs | Adopt visibility agreements for used-product flows and returned-material availability Establish backup collection hubs Introduce risk-tiered protocols for hazardous or sensitive returns | Visibility score Supply signal accuracy Collection continuity rate % hazardous loads processed without delay | ||
| Regulators/public agencies | Streamline emergency approvals Improve disaster-response coordination across reverse flow actors | Lead time for emergency approvals Regulatory response time | ||
Supply risk Financial risk Logistics risk Collection risk | OEMs | Use dynamic contracting for variable-quality return inputs | Material availability stability index | |
| Recyclers/Remanufacturers | Implement granular return-quality grading systems and automated inspection | % returns correctly classified Reprocessing defect rate | ||
| Suppliers/Logistics Partners | Contract for improved visibility of used-product flows Enhance forecast sharing and adopt continuous visibility tools for return volumes | Forecast accuracy Visibility score Variance of inbound return flows | ||
Operational risk | OEMs/Process Engineers | Adopt flexible staffing or workstation configuration to accommodate routine variability | Line utilisation rate Worker cross-skill index | |
| Disassembly and Inspection Centres | Standardise disassembly protocols Implement digital checklists aligned with the organisation's Standard Operating Procedures to reduce epistemic uncertainty | Processing time variance % rework Inspection accuracy | ||
Waste management risk Malicious attacks | OEMs, Public Sector | Strengthen cyber-resilience for IoT-enabled collection and handling systems Upgrade hazardous-waste handling systems | Number of cyber incidents Hazardous waste compliance rate Successful audit rate | |
| Recyclers | Introduce real-time monitoring for waste streams and anomaly alerts | Detection accuracy Response latency | ||
Demand risk | Manufacturers/Retailers | Deploy demand-sensing algorithms for green-product shifts Integrate near-real-time return analytics | Forecast error Demand volatility index | |
| Marketing/Customer Interface | Use behavioural nudges to stabilise return flows | Return predictability score Participation rate | ||
Natural resource scarcity | OEMs/Governments | Develop closed-loop resource recovery targets for critical materials Co-develop recycling infrastructure | % secondary material substitution Recycling yield Critical-resource dependency index | |
| Recyclers | Adopt high-efficiency extraction and recovery technologies | Recovery efficiency Cost per recovered unit | ||
Risk in general | All stakeholders | Establish cross-functional resilience governance structures | Resilience maturity score Frequency of cross-functional meetings % risks with assigned owners |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.