Table 6

Translating RL and CLSC risks into stakeholder actions and KPIs

P-I-M risk groupRisk typeStakeholder(s)Recommended actionKey KPI(s)
A (Low P–High I–Low M)
  • -

    Facility disruption

  • -

    Supply disruption

  • -

    Demand disruption

  • -

    Collection disruption

  • -

    Cost disruption

  • -

    Production disruption

OEMs/Re-manufacturers
  • -

    Develop multi-route and multi-facility recovery pathways and alternative processing capacity for hybrid facilities (production–recovery)

  • -

    Have backup processors pre-contracted

  • -

    Time-to-recovery

  • -

    % recovery throughput restored within 48 h

  • -

    Network redundancy index

Suppliers/Collectors/3PLs
  • -

    Adopt visibility agreements for used-product flows and returned-material availability

  • -

    Establish backup collection hubs

  • -

    Introduce risk-tiered protocols for hazardous or sensitive returns

  • -

    Visibility score

  • -

    Supply signal accuracy

  • -

    Collection continuity rate

  • -

    % hazardous loads processed without delay

Regulators/public agencies
  • -

    Streamline emergency approvals

  • -

    Improve disaster-response coordination across reverse flow actors

  • -

    Lead time for emergency approvals

  • -

    Regulatory response time

B (Medium P–Medium I–Medium M)
  • -

    Supply risk

  • -

    Financial risk

  • -

    Logistics risk

  • -

    Collection risk

OEMs
  • -

    Use dynamic contracting for variable-quality return inputs

  • -

    Material availability stability index

Recyclers/Remanufacturers
  • -

    Implement granular return-quality grading systems and automated inspection

  • -

    % returns correctly classified

  • -

    Reprocessing defect rate

Suppliers/Logistics Partners
  • -

    Contract for improved visibility of used-product flows

  • -

    Enhance forecast sharing and adopt continuous visibility tools for return volumes

  • -

    Forecast accuracy

  • -

    Visibility score

  • -

    Variance of inbound return flows

C (High P–Low I–High M)
  • -

    Operational risk

OEMs/Process Engineers
  • -

    Adopt flexible staffing or workstation configuration to accommodate routine variability

  • -

    Line utilisation rate

  • -

    Worker cross-skill index

Disassembly and Inspection Centres
  • -

    Standardise disassembly protocols

  • -

    Implement digital checklists aligned with the organisation's Standard Operating Procedures to reduce epistemic uncertainty

  • -

    Processing time variance

  • -

    % rework

  • -

    Inspection accuracy

D (Medium P–High I–Medium M)
  • -

    Waste management risk

  • -

    Malicious attacks

OEMs, Public Sector
  • -

    Strengthen cyber-resilience for IoT-enabled collection and handling systems

  • -

    Upgrade hazardous-waste handling systems

  • -

    Number of cyber incidents

  • -

    Hazardous waste compliance rate

  • -

    Successful audit rate

Recyclers
  • -

    Introduce real-time monitoring for waste streams and anomaly alerts

  • -

    Detection accuracy

  • -

    Response latency

E (Medium P–Medium I–Low M)
  • -

    Demand risk

Manufacturers/Retailers
  • -

    Deploy demand-sensing algorithms for green-product shifts

  • -

    Integrate near-real-time return analytics

  • -

    Forecast error

  • -

    Demand volatility index

Marketing/Customer Interface
  • -

    Use behavioural nudges to stabilise return flows

  • -

    Return predictability score

  • -

    Participation rate

F (Medium P–High I–Low M)
  • -

    Natural resource scarcity

OEMs/Governments
  • -

    Develop closed-loop resource recovery targets for critical materials

  • -

    Co-develop recycling infrastructure

  • -

    % secondary material substitution

  • -

    Recycling yield

  • -

    Critical-resource dependency index

Recyclers
  • -

    Adopt high-efficiency extraction and recovery technologies

  • -

    Recovery efficiency

  • -

    Cost per recovered unit

G (P-I-M not applied)
  • -

    Risk in general

All stakeholders
  • -

    Establish cross-functional resilience governance structures

  • -

    Resilience maturity score

  • -

    Frequency of cross-functional meetings

  • -

    % risks with assigned owners

Source(s): Authors’ own work

or Create an Account

Close Modal
Close Modal