Table 1.

Illustrative A-Matrix for a control module assembly in an electronics company

Location (of manifestation)Scrap (component damage) - IFRework (soldering defect) - IFCost of In-Process visual Inspection - APWarranty claim (module failure) - EFCost of supplier Qualification - PRExcess inventory (buffer for defects) - IFDowntime (machine jam) - IF
Supplier and incoming system
component kitting area    
incoming Inspection - PSU    (high test time)  
raw PCB storage  (oxidation)
Production process system
SMT Line 1 - Paste Print  (smearing)  (clean and rerun)  
SMT Line 1 - Pick and Place M/C A  (misplacement)  (manual correction)  
Manual Soldering Station #1    (100% Visual)  
automated conformal coating  (uneven coat)  (strip and recoat) 
In-Process quality control system
automated optical inspection (AOI)  (high cycle time)
In-Circuit test (ICT) station  (false fails)  (retest)  (fixture maint.) 
Finished goods and outgoing quality system
functional test station  (boot failure)  (firmware reload)  (test records) 
packaging and dispatch  (label error)  (repack)  (final check)
Customer and post-sales system
customer returns processing  (high RMA volume)
field service team  (repeat visits)
QMS support system
training department  (cost of outdated materials)
calibration lab  (overdue calibrations)
Note(s):

Legend: Very Significant; Significant; Minor. CoQ categories: IF = Internal Failure, AP = Appraisal, EF = External Failure, PR = Prevention

or Create an Account

Close Modal
Close Modal