Table 5.

Illustrative E-Matrix for an electronics company (annual costs in €, eval. Period 3 yrs, discount rate 12%)

Project IDTargeted causal loss (description)Origin location (of causal loss)Improvement techniqueKCh (€/yr)rGross saving (€/yr)I0 (€)O (€/yr)Net saving (€/yr)NPV (€) @3yrsPIIRR (%)
P1Inadequate soldering trainingQMS/HR (training dept.)IPC-A-610 Certification35,5000.8028,40010,0001,00027,40055,8266.58 >100%
P2APoor PSU qualitySupplier X (incoming mat. System)Joint QI programme with supplier alpha10,0000.606,0005,0005005,5008,2102.64  45%
P3Incorrect AOI test parametersICT (In-Process control)AOI vendor optimisation6,2500.704,3754,0002004,1756,0272.51  40%
P4Outdated SMT feeder calibrationSMT M/C A (production)Implement predictive maint.12,5000.759,3757,0008008,57513,5942.94  55%
P5Inadequate design reviewEngineering dept.Formal design review process13,0000.658,4506,0007007,75012,5203.09  50%
P6Poor component kittingSupplier and incoming systemEnhanced supplier audits7,2000.705,0403,0004004,6408,1453.71  65%
Note(s):

KCh values from C-Matrix (Table 3). PVIFA (12%, 3yrs) 2.4018. For P1: PV Net Savings = €27,400 * 2.4018 = €65,810. NPV = €65,810 - €10,000 = €55,810 (slight rounding difference from table). PI = €65,810 / €10,000 = 6.58. IRR values are illustrative and would be calculated using financial software