Table 6.

Comparison between final project ROI, company WACC and projects correctly classified by MPL algorithm. The ROI value is higher than the company’s WACC from project 13 on

CodeProject typeROIROI classMLP class
P1Lean manufacturing optimization3,2Very low
P2Six sigma quality improvement3,7Very low
P3Lean supply chain enhancement3,9Very low
P4Lean process streamlining3,9Very low
P5Six sigma defect reduction4,0Very low
P6Lean workflow efficiency5,2Low
P7Six sigma cycle time reduction5,6Low
P8Lean inventory management6,3Low
P9Six sigma cost reduction7,1Low
P10Lean product development7,4Low
P11Six sigma compliance alignment8,0Medium
P12Lean waste minimization8,3Medium
P13Six sigma process control8,9Medium
P14Lean just-in-time implementation8,9Medium
P15Six sigma variability reduction9,5Medium
P16Lean safety improvement9,9High
P17Six sigma supplier management10,2High
P18Lean production scaling10,4High
P19Six sigmas products optimizations10,7High
P20Lean continuous flow11,4High
P21Six sigma data analysis11,7High
P22Lean quality systems12,0High
P23Six sigma strategic planning13,2High
P24Lean energy efficiency13,3High
P25Six sigma automation projects14,5Very high
P26Lean sustainable practices15,0Very high
P27Six sigma advanced analytics15,3Very high
P28Lean production optimization16,2Very high
Note(s):

The check mark (✓) in the “MLP class” column indicates that the project has been correctly classified by the Multi-Layer Perceptron (MLP) algorithm

Source(s): Authors’ own work

or Create an Account

Close subscription notice
Close access options