Table 2

Lean-digital pathways for PC at primary stage

PathL1L2L3
Standardized management (PR1)
Mechanization and automation (PR2) 
Simulation of the whole process (PR3)
Total production maintenance (PR4)
Plan control (PR5) 
Establishment of digital information systems (PR6)
Consistency0.8500.8490.886
Raw coverage0.4060.3680.187
Unique coverage0.0480.0130.039
Solution coverage0.469
Solution consistency0.854

Note(s): “●” indicates that the variable exists and is the core variable, “” indicates that the variable exists and is the auxiliary variable, “ⓧ” indicates that the core variable does not exist, “ⓧ” indicates that the auxiliary variable does not exist. The blank spaces indicate neutrality (i.e. no pattern of presence or absence was identified)

Source(s): Authors’ own work