Second-order construct validation
| Construct and indicator | Weight | VIF |
|---|---|---|
| EMCS | ||
| Diagnostic control system | 0.314*** | 1.601 |
| Interactive control system | 0.254*** | 2.012 |
| Belief system | 0.336*** | 2.294 |
| Boundary system | 0.306*** | 2.245 |
| Construct and indicator | Weight | |
|---|---|---|
| Diagnostic control system | 0.314 | 1.601 |
| Interactive control system | 0.254 | 2.012 |
| Belief system | 0.336 | 2.294 |
| Boundary system | 0.306 | 2.245 |
Sample size n = 112. We report the path coefficients (e.g., weights) and variance inflation factors (VIFs) of our survey data. *, ** and *** indicate significance at the 0.1, 0.05 and 0.01 levels (two-tailed), respectively. EMCS = environmental management control system, measured as a reflective-formative second-order construct
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.