Operational performance indicators for the G208 reconstruction project
| Categories | Sub-categories | Indicators | Score | Evaluation criteria | Scoring methodology |
|---|---|---|---|---|---|
| Output | Project Operation | Road Network Information Services | 5 | Timely and accurate release of travel and road condition information | 3 points awarded for information releases that are timely, accurate, and compliant with regulatory requirements. Each instance of untimely or inaccurate release results in a deduction of 1 point, up to a maximum deduction of 5 points |
| Station Area Management | 5 | 1. Clean and tidy toll plaza environment without debris or garbage; facilities intact, clean, and undamaged. 2. Normal operation of toll lane equipment and facilities | 1. 0.5 points deducted per instance of unclean plaza, debris, damaged safety islands, zebra crossing paint peeling, canopy damage, or improper barrier placement (max 2 points) 2. 1 point deducted per unresolved equipment malfunction or network outage (max 3 points) | ||
| Toll Management | 10 | 1. Implementation of “Five Disclosures” (toll standards, approving authority, supervision hotline, social commitments, toll operator) 2. Standardized toll records management and strict adherence to approved charging standards | 1. 1 point deducted per missing disclosure item (max 2 points) 2. 3 points deducted for irregular record-keeping 3. 5 points deducted for non-compliance with approved standards | ||
| Project Maintenance | Maintenance System | 10 | 1. Annual/monthly maintenance planning and implementation 2. Emergency response plans for disasters/special weather 3. Complete inspection records with signatures 4. Timely post-rain inspections and repairs 5. 24-h issuance of repair orders for identified defects | 1. 1 point deducted per non-compliance item (max 2 points) 2. 1 point deducted per non-compliance (max 2 points) 3. 1 point deducted per incomplete/unverified record (max 2 points) 4. 1 point deducted per non-compliance (max 2 points) 5. 2 points deducted per failure (max 2 points) | |
| Maintenance Quality | 25 | Comprehensive evaluation of road maintenance quality meeting contractual requirements, with rectification plans for deficiencies | Full score awarded when Pavement Quality Index (PQI), Subgrade Condition Index (SCI), Bridge/Tunnel Condition Index (BCI), and Traffic Facilities Index (TCI) all ≥80. Otherwise, no points awarded | ||
| Maintenance Inspections | 14 | 1. Smooth pavement without defects 2. Intact bridge facilities 3. Well-maintained roadside vegetation 4. Complete ancillary facilities | 1. 0.5 points deducted per pavement defect (max 5) 2. 0.5 points deducted per bridge defect (max 5) 3. 0.5 points deducted per vegetation issue (max 1) 4. 0.5 points deducted per facility defect (max 3) | ||
| Safety Assurance | Safety Management System | 4 | 1. Established safety organization with dedicated personnel 2. Comprehensive safety regulations | 1. 1 point deducted per missing organizational element (max 2) 2. 1 point deducted per regulatory deficiency (max 2) | |
| Accident Handling | 8 | 1. Compliance with accident reporting requirements 2. Proper investigation and reporting of major incidents | 1. 2–4 points deducted for reporting violations 2. 1–4 points deducted for investigation/reporting failures | ||
| Emergency Plans | 4 | 1. Comprehensive emergency plans with resource inventories 2. Regular emergency drills | 1. 1 point deducted per planning deficiency (max 2) 2. 2 points deducted for drill non-compliance | ||
| Outcome | Ecological Impact | Energy Conservation | 1 | 1. Adoption of energy-efficient lighting 2. ≥80% asphalt recycling rate | 0.5 points deducted per unmet criterion |
| Environmental Penalties | 2 | Compliance with environmental regulations | 1 point deducted per penalty received (max 2) | ||
| Social Impact | Public Sentiment | 2 | 1. Effective complaint resolution 2. Avoidance of media exposure 3. Prevention of major incidents | Full deduction for major exposures; partial deductions for minor issues | |
| Travel Assurance | 2 | Implementation of traffic maintenance plans | 1 point deducted per significant traffic disruption | ||
| Satisfaction | Public Satisfaction | 3 | Public satisfaction survey results | 1 point base score; 0.1 points deducted per 1% below 80% satisfaction | |
| Management | Regulatory Compliance | Tax Compliance | 2 | Timely tax filing | Full deduction for non-compliance |
| Records Management | Archiving System | 1 | 1. Complete archival system 2. Dedicated personnel 3. Proper document control | 0.5 points deducted per deficiency (max 1) | |
| Information Disclosure | Timely Disclosure | 2 | Policy-compliant information sharing | Full deduction for non-compliance |
| Categories | Sub-categories | Indicators | Score | Evaluation criteria | Scoring methodology |
|---|---|---|---|---|---|
| Output | Project Operation | Road Network Information Services | 5 | Timely and accurate release of travel and road condition information | 3 points awarded for information releases that are timely, accurate, and compliant with regulatory requirements. Each instance of untimely or inaccurate release results in a deduction of 1 point, up to a maximum deduction of 5 points |
| Station Area Management | 5 | 1. Clean and tidy toll plaza environment without debris or garbage; facilities intact, clean, and undamaged. | 1. 0.5 points deducted per instance of unclean plaza, debris, damaged safety islands, zebra crossing paint peeling, canopy damage, or improper barrier placement (max 2 points) | ||
| Toll Management | 10 | 1. Implementation of “Five Disclosures” (toll standards, approving authority, supervision hotline, social commitments, toll operator) | 1. 1 point deducted per missing disclosure item (max 2 points) | ||
| Project Maintenance | Maintenance System | 10 | 1. Annual/monthly maintenance planning and implementation | 1. 1 point deducted per non-compliance item (max 2 points) | |
| Maintenance Quality | 25 | Comprehensive evaluation of road maintenance quality meeting contractual requirements, with rectification plans for deficiencies | Full score awarded when Pavement Quality Index (PQI), Subgrade Condition Index (SCI), Bridge/Tunnel Condition Index (BCI), and Traffic Facilities Index (TCI) all ≥80. Otherwise, no points awarded | ||
| Maintenance Inspections | 14 | 1. Smooth pavement without defects | 1. 0.5 points deducted per pavement defect (max 5) | ||
| Safety Assurance | Safety Management System | 4 | 1. Established safety organization with dedicated personnel | 1. 1 point deducted per missing organizational element (max 2) | |
| Accident Handling | 8 | 1. Compliance with accident reporting requirements | 1. 2–4 points deducted for reporting violations | ||
| Emergency Plans | 4 | 1. Comprehensive emergency plans with resource inventories | 1. 1 point deducted per planning deficiency (max 2) | ||
| Outcome | Ecological Impact | Energy Conservation | 1 | 1. Adoption of energy-efficient lighting | 0.5 points deducted per unmet criterion |
| Environmental Penalties | 2 | Compliance with environmental regulations | 1 point deducted per penalty received (max 2) | ||
| Social Impact | Public Sentiment | 2 | 1. Effective complaint resolution | Full deduction for major exposures; partial deductions for minor issues | |
| Travel Assurance | 2 | Implementation of traffic maintenance plans | 1 point deducted per significant traffic disruption | ||
| Satisfaction | Public Satisfaction | 3 | Public satisfaction survey results | 1 point base score; 0.1 points deducted per 1% below 80% satisfaction | |
| Management | Regulatory Compliance | Tax Compliance | 2 | Timely tax filing | Full deduction for non-compliance |
| Records Management | Archiving System | 1 | 1. Complete archival system | 0.5 points deducted per deficiency (max 1) | |
| Information Disclosure | Timely Disclosure | 2 | Policy-compliant information sharing | Full deduction for non-compliance |