Table 2

Validity and factor loadings for the work engagement measuring instrument

Name of variableConstructItemsStandard factor loadingComposite reliability (CR)Average variance extracted (AVE)Maximum shared variance (MSV)Average shared variance (ASV)
Work engagementAbsorptionAB-10.9470.8390.6360.0360.024
 AB-20.946    
 AB-30.787    
VigourVI10.8510.8430.6420.0360.032
 VI20.844    
 VI30.765    
DedicationDed10.8420.8040.5800.0280.021
 Ded20.787    
 Ded30.724    
Source(s): Computed by author

or Create an Account

Close Modal
Close Modal