Table 1

Case study project summary details

Project typeRef #Project description (Geography; scale in AUD$m; workforce size; duration; stage at interview)
Renewable energy technology development1Solar photovoltaics for ultra-low-cost solar (Australia; $320m; 250; 2012–2030; mature research)
2Electric vehicle orchestration (Australia; $7m; 30; 2020–2023; completed)
3Novel grid-connected solar energy generation and long-duration energy storage (Australia; $30m; 200; 2021–2024; implementation)
4Conversion of disused mine into pumped hydro storage facility (Australia; $800m; 1,000; 2014–2025; construction)
5Advancement of synchronous generator, synthetic inertia and battery operation technologies utilising AI virtual machines, auto-bidders and energy optimisation (Australia; $44m; 100; 2022–2044; handover)
6Solar photovoltaic deployment technology (Australia; $1m; 7, 2021–2024; proof of concept pilot)
Climate mitigation in the built environment7Passive house certified building of unprecedented scale and application (Australia; $170m; undeclared; undeclared-2020; occupied)
8Electrification of hot water heating systems at scale (Australia; $1m; 30; 2021–2022; completed)
9Passive house certification of unprecedented wooden mass accommodation structure (Australia; $30m; 350; 2017–2019; occupied)
10Precinct-scale microgrid development, demonstrating technology and market mechanisms, including AI-enabled generation and consumption prediction (Australia; $4m; 10; 2018–2022 completed)
11Novel stormwater harvesting systems (Australia; $7m+; 10; 2014-ongoing; ongoing for new builds)
12Community in–home energy efficiency upgrades (Australia; $4m; 30; 2023–2026; early implementation)
Environmental restoration13Co-design of integrated water and waste solutions in a living laboratory on an Asia Pacific river system (Indonesia; $20m; 36, 2019-approx. 2029; pilot)
14Processing of plastic waste within a polluted Asia Pacific river system (Indonesia; $<1m; 6; 2023–2024; implementation)
15Waste-to-resource processing of village-scale solid waste in an Asia Pacific riverine community (Indonesia; $<1m; 20; 2023–2024; multiple stages across elements)
16Knowledge hub network for sustainable urban transformation collaboration, including initiatives such as AI digital twin township planning (Indonesia and Malaysia; $<1m; 14; 2024–2025; Concept)
17Archaeological and microbial aspects of indigenous aquaculture restoration for sustainable food production, biodiversity and ecological resilience (Hawaii; $<1m; 12; 2020–2025; implementation)
Climate adaptation and resilience18Pathways for change applying modified resilience planning processes in natural disaster impacted areas (Australia; Undeclared; 25; 2022–2025; implementation)
19Innovative resilience enhancement project working with communities pre, during and post natural disasters (Australia; $70m; 70; 2020–2025; implementation)
20Placemaking as a collaborative and country-centred approach to improving the built and natural environments of natural disaster impacted communities (Australia; $<1m; 31; 2023–2025, implementation)
21Leading methods for resilience assessment in natural disaster impacted communities, including to measure resilience impacts against a baseline (Australia; $<1m; 24; 2023–2024; sharing findings)
Regenerative design22Project addressing community design elements, roads and water management for a self-supporting sustainable residential development within a fragile ecosystem - Sunrise at 1770 (Australia; undeclared; 100; 2000–2005; occupied)
23Project driving a leading example in sustainable development that incorporated conservation/biodiversity protection, sustainable design/technology, together with development of housing and recreational facilities - Sunrise at 1770 (Australia; $35m; 100; 1999–2003; mature)
24Regenerative development project (resort complex) with a range of sustainability objectives (Australia; $60m; 20; 2017–2026; design)
25Establishment of a sustainable rural eco-village, applying the philosophy of the Living Building Challenge (Australia; undeclared; undeclared; 2008–2024; occupied)
Societal resilience and disease prevention26Project to improve living conditions in informal settlements in the Asia Pacific (Fiji/Indonesia; $50m; 150; 2017–2027; implementation)
27Joint Venture up-scaling initiative as part of a global disease eradication program (Australia with international partners; undeclared; 80; 2000-ongoing; implementation)
28Resilience of island-based coastal urban settlements impacted by climate change (Kiribati; undeclared; undeclared; 2022–2032; multiple stages across elements)

or Create an Account

Close Modal
Close Modal