Table 3

Handling the third-level value drivers' impact on handling

Third levelImpact on handling
VolumesQualityTimeCostsSustainability
TechnologyLREUFXMPMIHFITHTHSPWMCECCFWRWS
AR                    
AGV                    
RFID                    

Note(s): Volumes: • Labour Productivity (LP) • Equiment Utilization (EU) • Flexibility (FX); Quality: • Material Damage Prevention (MP) • Materials Inspection (MI) • Handling Failures (HE); Time: • Idle Time (IT) • Handling Time (Handling time (Receiving, unloading, loading, dispatch …) HT • Health & Security (HS); Costs: • Personnel Wages (PW) • Mainatene Costs (MC) • Energy Costs (EC); Sustainbility: • Carbon Footprint (CF) • Waste Reduction (WR) • Worker Satisfaction (WS)

Source(s): Authors’ own work

or Create an Account

Close Modal
Close Modal