Model parameters
| Notation of parameters and variables | Parameter description |
|---|---|
| Railway network | |
| Set of technical stations in the network | |
| Set of stations within the hub | |
| ∈ N; denotes a station within the hub capable of handling originating/terminating trains | |
| Set of arcs (line sections) connecting two adjacent stations | |
| Arc belongs to the set of arcs | |
| Unit operation time for originating/terminating activities at a station (seconds/train) | |
| Standard running time of arc within the hub (seconds/train) | |
| Permitted line capacity of arc (trains/day) | |
| Originating/terminating capacity of station (trains/day) | |
| Depot maintenance capacity at station , (trains/day) | |
| Flow of conventional trains from station to direction (t) (trains/day) | |
| Flow of EMU trains from station to direction (t) (trains/day) |
| Notation of parameters and variables | Parameter description |
|---|---|
| Railway network | |
| Set of technical stations in the network | |
| Set of stations within the hub | |
| Set of arcs (line sections) connecting two adjacent stations | |
| Arc | |
| Unit operation time for originating/terminating activities at a station (seconds/train) | |
| Standard running time of arc | |
| Permitted line capacity of arc | |
| Originating/terminating capacity of station | |
| Depot maintenance capacity at station | |
| Flow of conventional trains from station | |
| Flow of EMU trains from station |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.