Potential assets for thermal activation for HS2 Phase 2b between Crewe and Manchester
| Asset type | Number/details | Heat source |
|---|---|---|
| Tunnel lining, accessed through six ventilation shafts and four tunnel portals | 16.18 km length, 447 047 m2 area | Train operations, ground thermo-hydrogeology |
| High-speed station | 2 | Waste heat from station, ground thermo-hydrogeology through foundations and station boxes |
| Depots | 2 | Ground thermo-hydrogeology through building foundations |
| Cutting and embankment retaining walls | 26 | Ground thermo-hydrogeology through thermal activation of walls |
| Transformer stations and electrical management sites | 12 | Waste heat from electrical equipment |
| Surface and subsurface water management (e.g. culverts, ponds) | 6 | Water source through heat pump |
| Asset type | Number/details | Heat source |
|---|---|---|
| Tunnel lining, accessed through six ventilation shafts and four tunnel portals | 16.18 km length, 447 047 m2 area | Train operations, ground thermo-hydrogeology |
| High-speed station | 2 | Waste heat from station, ground thermo-hydrogeology through foundations and station boxes |
| Depots | 2 | Ground thermo-hydrogeology through building foundations |
| Cutting and embankment retaining walls | 26 | Ground thermo-hydrogeology through thermal activation of walls |
| Transformer stations and electrical management sites | 12 | Waste heat from electrical equipment |
| Surface and subsurface water management (e.g. culverts, ponds) | 6 | Water source through heat pump |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.