Table 1

Summary of studies on construction delays in the Australian construction industry

StudyYearStudy focusGeographic scopeProject type
Kharka and Kharka (2022) 2022Identify risk factors responsible for project delays and cost overrun and explore the possibility of mitigation of risk by Early Involvement of ContractorAustralia (Melbourne)General construction
Derakhshanfar et al. (2021) 2022Delay risk impact, associations, and timingAustralia (national)Delayed construction projects (no size/type specified)
Al-Kilidar and Hasib (2021) 2021Identification and ranking of delay factors; stakeholder perceptionsAustralia (no specific regionGeneral construction (type/size not specified)
Basak et al. (2019) 2019Identifying and prioritising non-technical risks that cause schedule overruns in upstream gas projectsAustralia (national)Gas Projects
Shah (2016) 2016Causes of delay and cost overrun; cross-country comparisonAustralia, Malaysia, GhanaLarge-scale projects (75–150 million US dollars)
Wong and Vimonsatit (2012) 2012Identifying and analysing the major factors causing delays in construction projectsWestern AustraliaNot specify particular project types
Orangi et al. (2011) 2011Cost and time overrun issues in the linear construction projects for utility services infrastructure in VictoriaAustralia (Victoria)Pipeline projects