Table 1

A temporal plan for the railway routing problem of Figure 1 

Start (mm:ss)ActionDuration (mm:ss)
00:00DriveTrain(t1, A, B, broad)60:00
00:00DriveTrain(t2, F, E, meter)36:22
00:00Turnout(E, D, C)01:00
36:22DriveTrain(t2, E, C, meter)13:38
50:00Turnout(E, C, D)01:00
50:00BoardPassengers(t2, s1, C)03:00
60:00DriveTrain(t1, B, D, broad)10:00
70:00Turnout(B, D, C)01:00
70:00BoardPassengers(t1, s1, D)02:00
71:00DriveTrain(t2, C, B, meter)09:05
72:00DriveTrain(t1, D, E, broad)15:00
80:06DriveTrain(t2, B, A, meter)54:33
87:00DriveTrain(t1, E, F, broad)40:00

Note(s): Start times and durations are given in minutes and seconds (mm). The plan has a makespan of 134 minutes and 39 seconds