Table 5

Infrastructure-operation action schema

ActionPreconditionsEffectsDuration
ann.predicateann.predicate
Turnout (n, n1,n2)Start
  • junction_point(n)

  • turnout_alternatives(n, n1,n2)

  • connected(n, n1)

  • ¬ connected(n, n2)

Start
  • ¬ connected(n, n2)

  • ¬ connected(n2,n)

θ
End
  • connected(n, n2)

  • connected(n2, n)

Note(s): n1, n2 denote the alternative continuation points of the turnout at junction n, while the switching is in progress, neither alternative is connected

or Create an Account

Close subscription notice
Close access options