Table 9

Disrupted-operation benchmark instances grouped by increasing problem and disruption complexity

ScaleInstancesProblem characteristicsDisruption characteristics
TrainsStationsTrack pointsJunctionsBlocked trainBlocked trackEngine failureSlow-downAux. eng.
S1p101–p1103–125–1751–1282–71–11–31–11–31–1
S2p111–p12014–2318–31137–2148–131–13–41–13–51–1
M1p121–p13025–3532–45223–30114–201–25–61–16–81–1
M2p131–p14035–4545–57302–39520–292–310–132–313–172–3
L1p141–p15046–5659–71405–49730–393–413–163–317–213–3
L2p151–p16058–6873–85508–60140–494–516–193–422–263–4
L3p161–p17069–8087–100611–70550–605–620–234–526–304–5
VL1p171–p18080–92100–115706–80060–728–930–346–746–516–7
VL2p181–p19093–106117–132810–90473–869–1034–387–852–577–8
VL3p191–p200107–120134–150914–1,00887–10010–1038–428–857–638–8

Note(s): In addition to infrastructure size, instances vary in disruption severity, including blocked trains, blocked tracks, engine failures, slowdown segments and available auxiliary engines

or Create an Account

Close subscription notice
Close access options