Preliminary practitioner calibration survey after removing incomplete responses
| Task | Survey vignette | N | AI help | Barriers | Calibration-only adjusted score |
|---|---|---|---|---|---|
| T01 | Petroleum Engineer – Design drilling plans | 9 | 5.2 | 5.3 | 2.5 |
| T02 | Petroleum Engineer – Analyze geological data to determine drilling locations | 9 | 6.0 | 4.9 | 3.1 |
| T03 | Environmental Engineer – Prepare environmental permit applications | 9 | 7.2 | 4.6 | 3.7 |
| T04 | Environmental Engineer – Inspect facilities for environmental compliance | 9 | 4.2 | 8.0 | 1.1 |
| T05 | Mining Engineer – Prepare technical reports for regulatory agencies | 9 | 6.0 | 5.4 | 2.6 |
| T06 | Geoscientist – Analyze soil, rock, and groundwater samples | 9 | 5.2 | 5.2 | 2.9 |
| T07 | Civil Engineer – Review site plans for building code compliance | 9 | 5.0 | 7.2 | 1.0 |
| T08 | Surveyor – Prepare legal property boundary descriptions | 9 | 2.7 | 7.7 | 0.9 |
| T09 | Construction Manager – Review and approve contractor change orders | 9 | 6.3 | 5.8 | 2.9 |
| T10 | Water/Wastewater Engineer – Design water treatment processes | 9 | 5.3 | 5.8 | 2.5 |
| T11 | Environmental Inspector – Issue notices of violation | 9 | 2.6 | 8.3 | 0.4 |
| T12 | NDT Specialist – Interpret radiographic images to identify defects | 9 | 7.0 | 4.7 | 3.8 |
| T13 | Engineering Teacher – Develop course syllabi and materials | 9 | 8.7 | 2.7 | 6.4 |
| T14 | Mechanical Engineer – Perform stress analysis using FEA software | 9 | 4.6 | 6.7 | 1.7 |
| T15 | Construction Inspector – Sign off on completed building inspections | 9 | 1.4 | 8.3 | 0.2 |
| Task | Survey vignette | AI help | Barriers | Calibration-only adjusted score | |
|---|---|---|---|---|---|
| T01 | Petroleum Engineer – Design drilling plans | 9 | 5.2 | 5.3 | 2.5 |
| T02 | Petroleum Engineer – Analyze geological data to determine drilling locations | 9 | 6.0 | 4.9 | 3.1 |
| T03 | Environmental Engineer – Prepare environmental permit applications | 9 | 7.2 | 4.6 | 3.7 |
| T04 | Environmental Engineer – Inspect facilities for environmental compliance | 9 | 4.2 | 8.0 | 1.1 |
| T05 | Mining Engineer – Prepare technical reports for regulatory agencies | 9 | 6.0 | 5.4 | 2.6 |
| T06 | Geoscientist – Analyze soil, rock, and groundwater samples | 9 | 5.2 | 5.2 | 2.9 |
| T07 | Civil Engineer – Review site plans for building code compliance | 9 | 5.0 | 7.2 | 1.0 |
| T08 | Surveyor – Prepare legal property boundary descriptions | 9 | 2.7 | 7.7 | 0.9 |
| T09 | Construction Manager – Review and approve contractor change orders | 9 | 6.3 | 5.8 | 2.9 |
| T10 | Water/Wastewater Engineer – Design water treatment processes | 9 | 5.3 | 5.8 | 2.5 |
| T11 | Environmental Inspector – Issue notices of violation | 9 | 2.6 | 8.3 | 0.4 |
| T12 | NDT Specialist – Interpret radiographic images to identify defects | 9 | 7.0 | 4.7 | 3.8 |
| T13 | Engineering Teacher – Develop course syllabi and materials | 9 | 8.7 | 2.7 | 6.4 |
| T14 | Mechanical Engineer – Perform stress analysis using FEA software | 9 | 4.6 | 6.7 | 1.7 |
| T15 | Construction Inspector – Sign off on completed building inspections | 9 | 1.4 | 8.3 | 0.2 |
Note(s): Values are means on a 0–10 scale from 9 complete responses after excluding 2 incomplete records from the raw Google Forms CSV. The 15 vignettes and dimension wording are taken from question.pdf. D1 asks how much generative AI can technically assist the task assuming no legal, liability, or sign-off restrictions. D2 asks how much actual sign-off, liability, compliance, and audit-traceability requirements limit use of AI-generated outputs. A response was retained only when all 15 D1/D2 paired ratings were present and each task-level professional-judgement confirmation was marked yes. The calibration-only adjusted score is computed at respondent-task level as AI Help and then averaged. It is a descriptive calibration summary, not a validated exposure measure