Table 6

Cross-section trade-off for the 2 km baseline tunnel at 350 km/h, single train: exterior load, sealing time constant required to satisfy all UIC comfort criteria and excavation-volume proxy

A0 (m2)βExterior Δppp (kPa)Required τmin (s)Excavation proxy (103 m3/km)Change vs 100 m2 (excav./load/sealing)
700.1605.3020.670−30%/+46%/+72%
850.1324.3215.385−15%/+19%/+28%
1000.1123.6412.0100reference
Source(s): Author's own work