Table V

Details of large-size construction projects used in study

NumberName of projectLocationProject cost (US$Million)Operation capacity or project sizeSource
 1South Pars phase 12Iran – Kangan7,30071 million cubic meters per dayContractor
 2South Pars phase20&21Iran – Persian gulf4,50057 million cubic meters per dayContractor
 3Shazand Arak RefineryIran – arak203171 Gallon per dayContractor
 4Qom monorail systemIran – Qom1036.85 KmContractor
 5Ahwaz Urban Railway Project line oneIran – Ahvaz79123 km, 24 stationClient
 6Siah Bishe Pumped Storage ProjectIran – Tehran2601000 MWClient
 7QCLNG PlantAustralia – Queensalnd – Gladstone350200 Megalitres a dayContractor
 8Tailrace tunnelSri Lanka – Wellawaya853600 metersContractor
 9Ohda Residential ComplexVenezuela – Ohda5007000 unitContractor
10Cargo Transportation RouteKazakhstan – Prorva Port1,5008445 kmContractor
11Pareh-sar combined cycle power plantIran – Rezvanshahr9601000 MWClient
12Abadan Combined Cycle Power PlantIran – Abadan170210 MWClient
13Oseberg Delta 2 oil fieldNorway – North sea16018,000 BOE per dayContractor
14Kazeroon combined cycle power plantIran – Kazeroon1531373 MWClient
15Tabriz Urban Railway Project line twoIran – Tabriz40018000 metersContractor
16Bandar Abbas Gas Condensate RefineryIran – Bandarabbas2,600360000 gallonConsultant
17Roudbar Lorestan Dam and Hydro-Power StationIran – Roudbar330450 MWConsultant
18Tabriz oil refineryIran – Tabriz19824,000 cubic meters per dayContractor
20Metro project (Section 1 line 3)Iran – Tehran66512000 metersClient
21International Conference CenterIran – Isfahan19816000 square metersConsultant
22Torrens Island Power StationAustralia – Adelaide341280 MWContractor
23Gotvand DamIran – Gotvand682000 MWConsultant
24Sadr Two-Level HighwayIran – Tehran2125.5 KmContractor
25Niayesh tunnelIran – Tehran28110.25 KmConsultant
26Karun-3 DamIran – Khuzestan8502000 MWConsultant