Table 2.

Evaluation of alternatives 1, 2 and 3

CharacteristicAlternative 1Alternative 2Alternative 3
Facilities the new extension comprisesFacilities for a day care centreFacilities for fine art, handcrafts, home economics and natural sciencesNew kitchen facilities, a dining hall and facilities for natural science and home economics
Area of extension (Gross floor area, m2)1,812 + ventilation engine room2,2842,233
Technical level of the extension******
Cost******
AdvantagesFunctionality of the day nursery facilities
Minor renovation needs in the existing classrooms
The yard of the day nursery is quieter than the current yard as it is further away from the road, and particle emissions levels are lower
Functionality of the natural sciences, home economics, handcraft and fine art facilities
Possibility of building demanding facilities in a way that offers better moisture performance than currently
Practical and safe service transport
Functionality of the natural sciences and home economics classrooms
Possibility of building demanding facilities in way that offers better moisture performance than currently
DownsidesDelivery of the lunches to the day nursery
The service vehicles often drive through the yard, where the pupils spend time
Another kitchen and dining room in the extension
Particle emissions and noise in the yard of the day nursery
Loud noise from the dining hall being conveyed into the facilities of the day care centre
The service vehicles often drive through the yard, where the pupils spend time
Five units of day care instead of the required six units. The five units would cover the area of six units, but requires increasing the number of children in every unit
Delivery of lunches to the day nursery
Particle emissions and noise in the yard of the day nursery
Five units of day care instead of the required six units
Risks High financial losses if the refurbishment to eliminate the symptoms does not produce successful results as when the kitchen is refurbished, the room layout will be significantly modified and new staff facilities builtFinancial losses if the refurbishment to eliminate the symptoms does not produce successful results, as the room layout will be significantly modified and new staff facilities built