Table A1

Measures and item reliability

ConstructTypeItemsLoadingSource/reference
CRM consultant resources (CR)ReflectiveExperienced consultants guided us throughout the course of the project.
External consultants were experienced in our business processes.
External consultants brought considerable expertise and experience to our project
0.90**
0.87**
0.93**
Consultant resources (Karimi et al., 2007a)
User involvement (UI)ReflectiveThe user community was involved throughout the (CRM) implementation project.
Business users participated in determining systems needs and capabilities.
Business users participated in identifying input/output needs
0.85**
0.92**
0.89**
User involvement (Karimi et al., 2007a)
Application complexity (APP)ReflectiveThe CRM application was required to integrate with other applications.
The CRM technology was required to interface with other types of technology
0.89**
0.94**
Technical complexity (Gemino et al., 2008)
Requirements uncertainty (REQ)ReflectiveA lot of effort had to be spent in reconciling the requirements of various users.
Users differed a great deal among themselves in the requirements to be met
0.70**
0.96**
Requirements uncertainty (Gemino et al., 2008)
CRM system quality (SQ)ReflectiveThe application developed is reliable.
The application is easy to maintain.
The users perceive that the system meets intended functional requirements.
The system meets user expectations with respect to response time.
The overall quality of the developed application is high
0.83**
0.79**
0.80**
0.74**
0.90**
Product performance (Wallace et al., 2004)
Firm performance (FP)Average three-year ROAAverage three-year return-on-assets (ROA)NA 
Control variables
Relative project size (SIZ)Single-item measureHow does the size of this project compare with others undertaken by the client organization over the past three years?NAProject size (Gemino et al., 2008)
Firm size (REV)Single-item measureWhat is the annual revenue of your business unit (SBU) in the previous year?NA 
Time since system rolloutSingle-item measureNumber of months system used since rollout?NATime since system rollout (Karimi et al., 2007a)
IndustryCategorical measureWhat is your business unit’s (SBU) industry sector?NA 

or Create an Account

Close subscription notice
Close access options