Summary of tests
| Test | Consolidation pressure: kPa | Piles | Pile test on pile C? | Tunnel or pile test first | Pile variable | In this paper |
|---|---|---|---|---|---|---|
| GC1 | — | No (greenfield) | — | — | — | No |
| PC2 | 800 | Yes | Yes | Tunnel | Reference test | Yes |
| PC4 | 800 | Yes | Yes | Pile test | Low factor of safety* | Yes |
| PC5 | 400 | Yes | Yes | Tunnel | Low cu/E* | Yes |
| PC6 | 800 | Yes | No | — | Pile position* | No |
| Test | Consolidation pressure: kPa | Piles | Pile test on pile C? | Tunnel or pile test first | Pile variable | In this paper |
|---|---|---|---|---|---|---|
| GC1 | — | No (greenfield) | — | — | — | No |
| PC2 | 800 | Yes | Yes | Tunnel | Reference test | Yes |
| PC4 | 800 | Yes | Yes | Pile test | Low factor of safety | Yes |
| PC5 | 400 | Yes | Yes | Tunnel | Low | Yes |
| PC6 | 800 | Yes | No | — | Pile position | No |
Parameter relative to the corresponding parameter in the reference test.