Table 3

Summary of published case studies for high-rise buildings in Dubai

Project nameEmirates TowersBurj KhalifaPentominium tower
Project completion year20002010On hold
ReferencePoulos and Davids (2005) Poulos and Bunce (2008) Ibrahim et al. (2009) 
Range of design UCS values: MPa0·8–1·8a1·0–2·50·8–4·1
Range of design ultimate skin friction values: kPa200–450250–400215–486
Empirical correlation used0·25 × UCS1/20·25 × UCS1/20·25 × UCS1/2
Number of PTPs carried out366
Were PTPs brought to geotechnical failure?NoNoNo
Was the pile design be optimised based on the PTP results?NoNoNo
Is the pile design conservative?YesYesYes
a

Estimated from the information available in the publication by Poulos and Davids (2005) 

or Create an Account

Close Modal
Close Modal