Summary of key information from selected data sets
| Item | Project database | Pile diameter: mm | Pile length:a m | Pile cut-off level: mDMD | Bidirectional load cell level: mDMD | Rock head level: mDMD | Applied test load: kN |
|---|---|---|---|---|---|---|---|
| 1 | P5-A | 750 | 18·3 | −3·2 | −14·7 | −5·0 | 13 500 |
| 2 | P5-B | 1000 | 22·5 | −3·2 | −16·1 | −5·0 | 21 750 |
| 3 | P5-C | 1200 | 27·6 | −3·2 | −17·8 | −5·0 | 31 500 |
| 4 | P9-A | 1200 | 39·5 | 1·8 | −25·6 | −9·0 | 25 500 |
| 5 | P15-A | 750 | 16·2 | −6·3 | −17·1 | −12·0 | 8750 |
| 6 | P16-A | 1500 | 48·1 | −2·9 | −31·9 | −8·0 | 92 500 |
| 7 | P16-B | 1000 | 21·1 | −0·9 | −30·0 | −10 | 27 500 |
| 8 | P17-A | 1500 | 24·9 | −13·4 | −29·9 | −5·2 | 44 530 |
| 9 | P17-B | 1200 | 15·4 | −12·7 | −22·7 | −5·2 | 54 540 |
| 10 | P19-A | 1200 | 26·6 | −14·5 | −32·1 | −8·4 | 36 000 |
| 11 | P19-B | 1200 | 21·3 | −14·5 | −29·6 | −10·7 | 30 000 |
| 12 | P20 | 1500 | 27·0 | −18·4 | −35·8 | −15·9 | 55 200 |
| 13 | P23-A | 900 | 28·3 | −15·0 | −31·3 | −1·9 | 39 000 |
| 14 | P23-B | 900 | 28·0 | −13·0 | −30·3 | −1·6 | 31 900 |
| Item | Project database | Pile diameter: mm | Pile length: | Pile cut-off level: mDMD | Bidirectional load cell level: mDMD | Rock head level: mDMD | Applied test load: kN |
|---|---|---|---|---|---|---|---|
| 1 | P5-A | 750 | 18·3 | −3·2 | −14·7 | −5·0 | 13 500 |
| 2 | P5-B | 1000 | 22·5 | −3·2 | −16·1 | −5·0 | 21 750 |
| 3 | P5-C | 1200 | 27·6 | −3·2 | −17·8 | −5·0 | 31 500 |
| 4 | P9-A | 1200 | 39·5 | 1·8 | −25·6 | −9·0 | 25 500 |
| 5 | P15-A | 750 | 16·2 | −6·3 | −17·1 | −12·0 | 8750 |
| 6 | P16-A | 1500 | 48·1 | −2·9 | −31·9 | −8·0 | 92 500 |
| 7 | P16-B | 1000 | 21·1 | −0·9 | −30·0 | −10 | 27 500 |
| 8 | P17-A | 1500 | 24·9 | −13·4 | −29·9 | −5·2 | 44 530 |
| 9 | P17-B | 1200 | 15·4 | −12·7 | −22·7 | −5·2 | 54 540 |
| 10 | P19-A | 1200 | 26·6 | −14·5 | −32·1 | −8·4 | 36 000 |
| 11 | P19-B | 1200 | 21·3 | −14·5 | −29·6 | −10·7 | 30 000 |
| 12 | P20 | 1500 | 27·0 | −18·4 | −35·8 | −15·9 | 55 200 |
| 13 | P23-A | 900 | 28·3 | −15·0 | −31·3 | −1·9 | 39 000 |
| 14 | P23-B | 900 | 28·0 | −13·0 | −30·3 | −1·6 | 31 900 |
Length of pile is from cut-off level
mDMD, metres Dubai Municipality Datum