Table 4.

The summary of the Canary Wharf project

ProjectCanary Wharf project, London, UK
When2003
AimOptimising the crowd throughput
ProblemCanary Wharf was experienced an incredible crowd safety restated tread and the police did not have the official or legal authority to call an evacuation
SolutionThe use of DIM-ICE risk model assisted in analysing the capacity of all the existing available roads and optimising the crowd movement away from the location of the thread
BenefitsInformation provided regarding the route that had the maximum capacity to direct people and move them away from the thread
People impacted by the project recommendations90,000 per day
Notes: White squares = areas that are sufficient, no improvements are required; light grey squares = require improvement; and grey squares = require much improvement to avoid crowd safety issues.