Table 5.

The summary of the Murrayfield Stadium project

ProjectMurrayfield Stadium, Edinburgh, UK
When2018
AimOptimising the crowd throughput
ProblemA new building was developing – would the crowd adapt to the new environment?
There were two minor injuries on site – were the existing safety procedures adequate?
SolutionThe use of DIM-ICE risk model assisted in analysing the current situation and providing a set of recommendation
Benefits>90% of Murrayfield Stadium’s safety operations were appropriate
Areas that required improvement regarding the existing risk assessment policy were identified
The design of the queuing system was improved to achieve the more efficient inflow
Murrayfield Stadium demonstrate continual assessment and improvement to the risk management process
Customer satisfaction was enhanced
People impacted by the project recommendations67,000 per event