Input variables for the ERI
| Variable | Description | Scale | Description | Application | Description | Calculation |
|---|---|---|---|---|---|---|
| AEu | A. Active bank erosion beneath the crossing | 0 | No or unsatisfactory photographic evidence | AELu | A1. Erosion beneath the crossing, left bank | AEu = max (AELu, AERu) |
| 1 | Absence of evidence of bank erosion | AERu | A2. Erosion beneath the crossing, right bank | |||
| 3 | Evidence of bank erosion | |||||
| 5 | Evidence of severe bank erosion | |||||
| AE5w | B. Active bank erosion five channel widths (5w) upstream or downstream of the crossing | 0 | No or unsatisfactory photographic evidence | AEUL5w | B1. Erosion upstream of the crossing, left bank | AE5w = max (AEUL5w, AEUR5w, AEDL5w, AEDR5w) |
| 1 | Absence of evidence of bank erosion | AEUR5w | B2. Erosion upstream of the crossing, right bank | |||
| 3 | Evidence of bank erosion | AEDL5w | B3. Erosion downstream of the crossing, left bank | |||
| 5 | Evidence of severe bank erosion | AEDR5w | B4. Erosion downstream of the crossing, right bank | |||
| BPu | C1. Bank protection beneath the crossing | 0 | No or unsatisfactory photographic evidence | BPLu | C1a. Bank protection beneath the crossing, left bank | BPu = max (BPLu, BPRu) |
| 1 | Hard structure (concrete/masonry/steel piles) | BPRu | C1b. Bank protection beneath the crossing, right bank | |||
| 3 | Soft structure (rip-rap, gabion basket, other) | |||||
| 5 | No protection | |||||
| BP5w | C2. Bank protection five channel widths upstream or downstream | 0 | No or unsatisfactory photographic evidence | BPUL5w | C2a. Bank protection upstream of the crossing, left bank | BP5w = max (BPUL5w, BPUR5w, BPDL5w, BPDR5w) |
| 1 | Hard structure (concrete/masonry/steel piles) | BPUR5w | C2b. Bank protection upstream of the crossing, right bank | |||
| 3 | Soft structure (rip-rap, gabion basket, other) | BPDL5w | C2c. Bank protection downstream of the crossing, left bank | |||
| 5 | No protection | BPDR5w | C2d. Bank protection downstream of the crossing, right bank | |||
| Condition | Condition of bank protection | 1 | Undamaged – intact as-new condition | |||
| 2 | Minor damage – intact but with some isolated damage | |||||
| 3 | Moderate – intact but with widespread damage | |||||
| 4 | Severe damage – intact but likely to fail and remedial work required to stabilise bank | |||||
| 5 | Failed – in pieces, offers no protection | |||||
| β | D. Bank angle | 1 | <30° | |||
| 3 | 30–80° | |||||
| 5 | >80°/undercut | |||||
| V | E. Vegetation | 1 | Both high and low vegetation | |||
| 3 | Either low or high vegetation | |||||
| 5 | No vegetation or very sparse cover |
| AEu | A. Active bank erosion beneath the crossing | 0 | No or unsatisfactory photographic evidence | AELu | A1. Erosion beneath the crossing, left bank | AEu = max (AELu, AERu) |
| 1 | Absence of evidence of bank erosion | AERu | A2. Erosion beneath the crossing, right bank | |||
| 3 | Evidence of bank erosion | |||||
| 5 | Evidence of severe bank erosion | |||||
| AE5w | B. Active bank erosion five channel widths (5w) upstream or downstream of the crossing | 0 | No or unsatisfactory photographic evidence | AEUL5w | B1. Erosion upstream of the crossing, left bank | AE5w = max (AEUL5w, AEUR5w, AEDL5w, AEDR5w) |
| 1 | Absence of evidence of bank erosion | AEUR5w | B2. Erosion upstream of the crossing, right bank | |||
| 3 | Evidence of bank erosion | AEDL5w | B3. Erosion downstream of the crossing, left bank | |||
| 5 | Evidence of severe bank erosion | AEDR5w | B4. Erosion downstream of the crossing, right bank | |||
| BPu | C1. Bank protection beneath the crossing | 0 | No or unsatisfactory photographic evidence | BPLu | C1a. Bank protection beneath the crossing, left bank | BPu = max (BPLu, BPRu) |
| 1 | Hard structure (concrete/masonry/steel piles) | BPRu | C1b. Bank protection beneath the crossing, right bank | |||
| 3 | Soft structure (rip-rap, gabion basket, other) | |||||
| 5 | No protection | |||||
| BP5w | C2. Bank protection five channel widths upstream or downstream | 0 | No or unsatisfactory photographic evidence | BPUL5w | C2a. Bank protection upstream of the crossing, left bank | BP5w = max (BPUL5w, BPUR5w, BPDL5w, BPDR5w) |
| 1 | Hard structure (concrete/masonry/steel piles) | BPUR5w | C2b. Bank protection upstream of the crossing, right bank | |||
| 3 | Soft structure (rip-rap, gabion basket, other) | BPDL5w | C2c. Bank protection downstream of the crossing, left bank | |||
| 5 | No protection | BPDR5w | C2d. Bank protection downstream of the crossing, right bank | |||
| Condition | Condition of bank protection | 1 | Undamaged – intact as-new condition | |||
| 2 | Minor damage – intact but with some isolated damage | |||||
| 3 | Moderate – intact but with widespread damage | |||||
| 4 | Severe damage – intact but likely to fail and remedial work required to stabilise bank | |||||
| 5 | Failed – in pieces, offers no protection | |||||
| D. Bank angle | 1 | <30° | ||||
| 3 | 30–80° | |||||
| 5 | >80°/undercut | |||||
| E. Vegetation | 1 | Both high and low vegetation | ||||
| 3 | Either low or high vegetation | |||||
| 5 | No vegetation or very sparse cover |
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.