Ranking of effect factors of poor communication based on factor loadings
| Group/Construct | Effect factors | Code | Ranking |
|---|---|---|---|
| Unproductive practitioners | Demotivation | PRA4 | 1 |
| High stress in the workplace | PRA2 | 2 | |
| Low level of satisfaction | PRA3 | 3 | |
| Deteriorating relationship and cooperation | PRA1 | 4 | |
| Performance deficiency | Waste generation | PER2 | 1 |
| Safety standard violations | PER7 | 2 | |
| Low productivity | PER1 | 3 | |
| Poor collaboration | PER3 | 4 | |
| Cost overrun | PER9 | 5 | |
| Rework occurrence | PER5 | 6 | |
| Failure of the project | PER6 | 7 | |
| Dispute | PER8 | 8 | |
| Time overrun | PER4 | 9 | |
| Process interruption | Redesign | PRO1 | 1 |
| Misinterpreted technical information | PRO2 | 2 | |
| Frequent remedies in design and planning schedules | PRO3 | 3 | |
| Information overlapping | PRO4 | 4 |
| Group/Construct | Effect factors | Code | Ranking |
|---|---|---|---|
| Unproductive practitioners | Demotivation | PRA4 | 1 |
| High stress in the workplace | PRA2 | 2 | |
| Low level of satisfaction | PRA3 | 3 | |
| Deteriorating relationship and cooperation | PRA1 | 4 | |
| Performance deficiency | Waste generation | PER2 | 1 |
| Safety standard violations | PER7 | 2 | |
| Low productivity | PER1 | 3 | |
| Poor collaboration | PER3 | 4 | |
| Cost overrun | PER9 | 5 | |
| Rework occurrence | PER5 | 6 | |
| Failure of the project | PER6 | 7 | |
| Dispute | PER8 | 8 | |
| Time overrun | PER4 | 9 | |
| Process interruption | Redesign | PRO1 | 1 |
| Misinterpreted technical information | PRO2 | 2 | |
| Frequent remedies in design and planning schedules | PRO3 | 3 | |
| Information overlapping | PRO4 | 4 |