Lean tools
| Lean tools | Explanation |
|---|---|
| Kanban | The Kanban system allows for the examination of the process and links upstream activities to downstream operations Adnan et al. (2013). This system allows for the production and delivery of components when they are actually needed Aguilar-Escobar et al. (2015) |
| 5S | The 5 S methodology (sort, set in order, shine, standardize, sustain) aims to add order and cleanliness to operations Kanamori et al. (2015) |
| Value stream mapping (VSM) | VSM is a powerful tool that aims to map the flow of information or materials from the first step until the product is delivered to the customer Dighe and Kakirde (2014) |
| Going to the Gemba and voice of customer | Gemba helps to achieve a deeper understanding of the needs and problems of the customer when the customer actually uses the product. Gemba can be achieved through worksite visits/inspections, observation and customer interviews. This process helps to understand the voice of customers Ronney et al. (2000) |
| Standardized work | Is an evidence-based, well-documented process that has minimal or no error. Helps to apply best practices and should be a living document |
| Error proofing/mistake proofing/Poka-Yoke | Method to identify and avoid mistakes that could add to the overall cost |
| Root cause analysis | Methods to evaluate an adverse event/failure and identify the need for corrective actions. Commonly used tools include the 5 whys and causal tree Williams (2001) |
| Just-in-time (JIT) | The JIT approach aims to improve efficiency by producing the right parts at the right time when they are actually needed by the end user (customer or next process) Adnan et al., (2013) |
| Takt time | Facilitates smooth operations by examining time needed for the production of services demanded by customers. It helps with planning and utilizing the entire business capacity to deliver the right thing at the right time to the customer [4] |
| Lean tools | Explanation |
|---|---|
| Kanban | The Kanban system allows for the examination of the process and links upstream activities to downstream operations |
| 5S | The 5 S methodology (sort, set in order, shine, standardize, sustain) aims to add order and cleanliness to operations |
| Value stream mapping (VSM) | VSM is a powerful tool that aims to map the flow of information or materials from the first step until the product is delivered to the customer |
| Going to the Gemba and voice of customer | Gemba helps to achieve a deeper understanding of the needs and problems of the customer when the customer actually uses the product. Gemba can be achieved through worksite visits/inspections, observation and customer interviews. This process helps to understand the voice of customers |
| Standardized work | Is an evidence-based, well-documented process that has minimal or no error. Helps to apply best practices and should be a living document |
| Error proofing/mistake proofing/Poka-Yoke | Method to identify and avoid mistakes that could add to the overall cost |
| Root cause analysis | Methods to evaluate an adverse event/failure and identify the need for corrective actions. Commonly used tools include the 5 whys and causal tree |
| Just-in-time (JIT) | The JIT approach aims to improve efficiency by producing the right parts at the right time when they are actually needed by the end user (customer or next process) |
| Takt time | Facilitates smooth operations by examining time needed for the production of services demanded by customers. It helps with planning and utilizing the entire business capacity to deliver the right thing at the right time to the customer |