Table 7

Overview of the three possible interventions for adapting the flexible design

InterventionIllustrationCost:a millions CHFTriggering logic
Convert the highway into two separate traffic lanes per directionRoadTunnel50Number of autonomous vehicles > number of human-driven vehicles
  
BridgeRamp
  
Convert the highway into three separate traffic lanes per directionRoadTunnel200>10 000 users/h
  
BridgeRamp
  
Add a charging station 5Number of electric vehicles > number of combustion vehicles
a

Cost derived from the estimate in the newspaper article by Anon (2005) 

or Create an Account

Close Modal
Close Modal