Table 3.

Ship data

Tanker data itemShip 1Ship 2Ship 3
Deadweight in mt* (capacities other than cargo are ignored)40,00050,00070,000
Weight in mt* per 1 meter of ship draught3,9214,4285,112
Low, medium and high speed in knots15, 17 and 1914, 16 and 1813, 15 and17
Main engine** laden fuel consumption in mt*/day37, 54 and 7535, 52 and 7435, 55 and 79
Main engine** ballast fuel consumption in mt*/day22, 32 and 4422, 33 and 4720, 31 and 45
Auxiliary engine*** fuel consumption in mt*/day0.50.61
Heating fuel consumption in mt* of main engine**   
fuel/day/100 mt* of cargo0.1250.110.1
Sues Canal dues, laden and ballast in US$158,960; 135,180172,310; 146,560185,650; 157,940
Panama Canal dues, laden and ballast in US$79,000; 62,90098,250; 78,150117,500; 93,400
Bosporus and Dardanelles dues in US$9,64012,15013,850
Running cost in US$/day5,0007,0007,700

Notes:

*

mt = metric ton;

**

Fuel cost of main engine is $315/mt;

***

Fuel cost of auxiliary engine is $472.5/mt

or Create an Account

Close Modal
Close Modal