Table 2.

Common input items for shipyard productivity evaluation

Input variables
Study (year)Dock areaLargest dock areaCrane total loadWorker/CGTWorker/HourCost/DWTWorkerTotal execution timeWaiting timeErection areaITechIndEnv
Colin and Pinto (2009) • •   •     
Zhangpeng and Flynn (2006) •  • ••     
Pires and Lamb (2008)          •••
Krishnan (2012) •  •• •     
Park et al. (2014)        ••   
This study• •   •     

Notes: CGT = compensated gross tonnage; DWT = deadweight tonnage; ITech = technological development index; IndEnv = shipbuilding environment index

or Create an Account

Close subscription notice
Close access options