Common output items for shipyard efficiency evaluation
| Output variables | ||||||||
|---|---|---|---|---|---|---|---|---|
| Study (year) | CGT | DWT | Type of vessel | Profit | Labor productivity | Building time | No. of operations | Material amount |
| Colin and Pinto (2009) | • | • | ||||||
| Zhangpeng and Flynn (2006) | ||||||||
| Pires and Lamb (2008) | • | • | ||||||
| Krishnan (2012) | • | • | • | |||||
| Park et al. (2014) | • | • | ||||||
| This study | • | |||||||
| Output variables | ||||||||
|---|---|---|---|---|---|---|---|---|
| Study (year) | CGT | DWT | Type of vessel | Profit | Labor productivity | Building time | No. of operations | Material amount |
| • | • | |||||||
| • | • | |||||||
| • | • | • | ||||||
| • | • | |||||||
| This study | • | |||||||
Notes: CGT = compensated gross tonnage; DWT = deadweight tonnage
Sharing content requires targeting cookies to be enabled. Please update your cookie preferences to use this feature.