| Bridge Engineering | | |
| Performance of a stress-laminated-timber arch bridge, by Abdy Kermani and Geoff Freedman | December | Bill Curtin Medal |
| A34 Chieveley/M4 Junction 13 improvement: design, by David Place, Imran Farooq and Sue Carter | March | Reed and Mallik Medal |
| Design and construction of the Sail Bridge, Swansea, by Paul Sanders and Ian Firth | December | John Henry Garrood King Medal |
| Filsa Bridge, Norway—a record-breaking timber bridge, by Per Ekeberg and Ketil Søyland | March | Overseas Prize (2) |
| Refurbishment of the old Medway Bridge, UK, by David Smith | September | Telford Premium |
| Civil Engineering | | |
| UK power: an ever-changing challenge for civil engineers, by Anthony Price | November | James Watt Medal |
| Improving traffic behaviour and safety through urban design, by Ben Hamilton-Baillie and Phil Jones | May | Rees Jeffreys Award |
| Why wind power works for Denmark/ Why UK wind power should not exceed 10GW, by Hugh Sharman | May/November | Telford Medal |
| Falsework verticality: leaning towards danger?, by Michael Burrow, Les Clark, Peter Pallett, Ray Ward and David Thomas | February | Telford Premium |
| Marine energy: getting power from tides and waves, by David Kerr | November | Trevithick Memorial |
| Modernising the UK's west coast main line railway, by Richard Spoors and James Martin | August | Webb Prize (1) |
| Engineering Sustainability | | |
| Urban biodiversity and sustainable development, by Rossa Donovan, Jonathan Sadler and John Bryson | June | Halcrow Prize (1) |
| Geotechnical Engineering | | |
| Construction monitoring of cut and cover tunnel, by Gary Holmes, Howard Roscoe and Adam Chodorowski | October | Halcrow Prize (2) |
| Comparing CPT and pile base resistance in sand, by David White and Malcolm Bolton | January | Telford Premium |
| Maritime Engineering | | |
| Wave overtopping at vertical and steep seawalls, by William Allsop, Tom Bruce, Jonathan Pearson and Phillip Besley | September | David Hislop Award |
| Municipal Engineer | | |
| Effective flood alleviation design and construction, by Warren Bradley | June | Frederick Palmer Prize |
| Community involvement in coast protection at Lyme Regis, UK, by Geoff Davis and Keith Cole | March | James Hill Fund |
| Managing a city's transportation network—a case study, by Paul Welsh | December | Manby Prize |
| Structures and Buildings | | |
| Deficiencies of the normal moment yield criterion for RC slabs, by Ian May and Sarosh Lodi | December | Howard Medal |
| Crowd circulation and stadium design: low flow rate systems, by David Brocklehurst, Dino Bouchlaghem, David Pitfield, Gary Palmer and Keith Still | October | Safety in Construction Prize |
| Transport | | |
| The safe management of civil airfield pavements, by John Barling and Paul Fleming | May | Parkman Medal |
| Railway risks, safety values and safety costs, by Andrew Evans | February | Baker Medal |
| The rise and fall of Edinburgh's congestion charging plans, by John Saunders | November | Webb Prize (2) |
| Water Management | | |
| 3-D computation of sediment transport at water intakes, by N. Ruether, J.M. Singh, N.R.B. Olsen and E. Atkinson | March | Cooper Hill War Memorial Prize |
| Pehur high-level canal, NWFP, Pakistan, by Adrian Laycock, Chris Swayne and José Marques | September | Overseas Prizes (1) |
| Real-time hydro-power forecasting on the Victoria Nile, by Robin Wardlaw, Mohd Sharif and Fred Kimaite | June | Robert Alfred Carr Prize |
| Impact of climate change on UK flooding and future predictions, by Murray Dale | December | Telford Premium |