Table 1.

Test pile geometries and loading

PileD: mNominal L/DInstalled L: mInstalled L/Dt: mmh: mh/DEmbedded instrumentsDate installedDate tested
DS10·2735·251·435·2475·018·3 08/11/1422/04/15
DS20·2735·251·435·2475·018·3 08/11/1425/04/15
DS30·27382·18875·018·3 08/11/1423/04/15
DS40·273102·731075·018·3 08/11/1424/04/15
DM50·76232·272·98109·9913·1 10/11/1408/05/15
DM70·76232·242·941010·0013·1Y10/11/1414/05/15
DM40·7625·253·985·22149·9813·1Y10/11/1412/05/15
DM90·7625·253·965·201410·0013·1 10/11/1430/04/15
DM60·7625·253·995·241910·0013·1Y10/11/1405/06/15
DM30·76286·027·902510·0613·2Y06/11/1403/06/15
DL125·2510·615·30389·904·95Y14/11/1420/06/15
DL225·2510·575·29389·894·95Y13/11/1420/06/15

Notes: D, Dunkirk; S, small diameter (0·273 m); M, medium diameter (0·762 m); L, large diameter (2·0 m); ‘Nominal (L/D)’ refers to the initial specifications of the test piles; ‘Installed L’ and ‘Installed L/D’ refer to measured pile embedded lengths after installation.