Table 1.

Test pile geometries and loading

PileD: mNominal L/DInstalled L: mInstalled L/Dt: mmh: mh/DEmbedded instrumentsDate installedDate tested
CS10·2735·251·435·2475·018·32 06/12/1416/01/15
CS20·2735·251·435·2475·018·32 06/12/1422/01/15
CS30·27382·188·075·018·32 06/12/1428/01/15
CS40·273102·7310·075·018·32 06/12/1420/01/15
CM20·76232·242·941010·0613·20Y17/10/1407/04/15
CM80·76232·272·98109·9213·02 14/10/1416/02/15
CM60·7625·254·015·26119·9813·10Y08/12/1410/03/15
CM90·7625·253·985·22119·9813·10 17/10/1412/02/15
CM10·7625·253·985·22159·9813·10Y17/10/1405/03/15
CM30·762107·599·962510·0113·14Y05/12/1402/03/15
CL12·05·2510·355·182510·105·05Y09/12/1421/07/15
CL22·05·2510·605·302510·105·05Y08/12/1421/07/15

Notes: C, Cowden; S, small diameter (0·273 m); M, medium diameter (0·762 m); L, large diameter (2·0 m). ‘Nominal (L/D)’ refers to the initial specifications of the test piles; ‘Installed L’ and ‘Installed L/D’ refers to measured pile embedded lengths after installation.